Scholl et al. (2013) generated two types of data sets for the setup assembly line balancing and scheduling problem (SUALBSP) based on the classical SALBP-1 benchmark data set. For details of the generation process, we refer to Scholl et al. (2013, Section 7.1).

Download:

Note: In the data sets, only required setup times (respective tasks can be done in direct forward or backward succession in the same station) are given. All others are zero or irrelevant. We thank Rasul Esmaeilbeigi (University of Newcastle, Australia) for his hint at a mistakable circumstance.

References: